What Goes Into an Electrical Take-Off (and What Gets Missed)

Written by RCG Consultants

The take-off is the foundation of an electrical estimate. If an item is missed here, it is missed in the price, and the cost comes out of your margin later.

What a take-off covers

A take-off counts and measures every item shown on the drawings and called up in the specification: luminaires, power and data outlets, switchboards, cable, conduit and containment, and the testing that goes with them.

Measure to scale

Cable runs, conduit and similar services should be measured to scale from the drawings, not estimated by eye, with an allowance for wastage. Allowing about 10 percent for wastage is a common starting point.

What gets missed

Common misses include items called up in the specification but not drawn, cable and conduit runs between buildings and back to switchboards, communications and data conduits, temporary power, testing and commissioning, and changes buried in addenda.

Check it a second way

Once the first count is done, count again using a different method, for example by room, then by system. A second count catches items that a first pass misses.

Need a hand with a take-off?

RCG Consultants provides electrical take-offs, estimating and tender and bid submission support, Australia-wide and in New Zealand. Contact us on (07) 3558 1449 or tenders@rcgconsultants.com.au.

Next
Next

Outsourcing Electrical Estimating: When It Makes Sense for a Contractor